Cloud Migration Services for B2B SaaS Companies
Cloud migration built for a multi-tenant SaaS product, not a generic enterprise workload: zero-downtime cutover for paying tenants, per-tenant isolation and cost modeling, SOC 2 evidence collected during the move, and a target AWS or Azure architecture designed for how a SaaS app actually scales. Rule27 Design migrates a 15-to-150-person SaaS company's one product, with development work at the $175/hr Development Lab rate.
A B2B SaaS company moving its multi-tenant product off a drifted hosting stack cannot take downtime on paying tenants, has to preserve per-tenant isolation through the cutover, and often needs SOC 2 evidence out of the migration, none of which the enterprise-workload migration vendors dominating this search result address.
This page is for a B2B SaaS founder, CTO, or VP of Engineering moving a multi-tenant SaaS product, not a generic enterprise workload, from a stack that has outgrown it: self-managed EC2, Heroku, DigitalOcean, on-prem colo, or a first-generation cloud setup that has drifted. The trigger is usually a Series B or C round with infra runway, a SOC 2 or ISO 27001 gap, cloud-spend pressure, a replatform decision, or an acquisition. It is a 15-to-150-person SaaS migrating one product, not a CIO moving hundreds of databases.
What makes a SaaS migration different
The thing that earns the SaaS qualifier is the tenant. You cannot take downtime on paying customers, so the cutover has to be zero-downtime, usually blue/green with active traffic. Per-tenant isolation has to survive the move intact, both the data boundaries and the security model. And the target architecture has to reflect how a multi-tenant app actually scales, which is per-tenant load and cost, not a single monolithic workload. The vendors ranking for this query migrate applications, databases, and data centers for the enterprise. Rule27 migrates a SaaS product, which is a different problem.
The target architecture and the SOC 2 opportunity
Rule27 designs the AWS or Azure target for the SaaS use case: the compute and data model that supports multi-tenancy, cost-per-tenant visibility so unit economics are legible after the move, and the isolation controls a security review will scrutinize. Because many migrations are triggered by a SOC 2 or ISO 27001 gap, the migration is run so the evidence a SOC 2 audit needs, access controls, logging, encryption, change management, is collected during the move rather than reconstructed afterward. That turns a cost center into a compliance milestone.
Scoped, bundled, and billed transparently
Rule27 scopes the migration as an assessment, a target-architecture design, a staged cutover, and a post-migration optimization pass, with development work billed at the $175/hr Development Lab rate. It is usually bundled with app development rather than sold as a standalone infrastructure lift, because a SaaS company replatforming its infra is often also evolving its product. Rule27 holds 56+ certifications across 9 platforms, so the AWS and Azure work sits inside a broader engineering practice, and it migrates and implements on both without being locked to one.
Migration assessment and plan
A written assessment of the current stack, tenant model, and compliance gaps, with the move sequence and zero-downtime risks identified.
Target AWS or Azure architecture
A target architecture designed for multi-tenancy, with per-tenant isolation controls and cost-per-tenant visibility.
Zero-downtime cutover
A blue/green, per-tenant-staged cutover for active paying customers, with a documented rollback plan.
SOC 2 or ISO 27001 evidence package
Access control, logging, encryption, and change-management evidence collected during the migration for the audit that often triggered it.
FinOps and cost-per-tenant model
A post-migration cost model that makes unit economics legible per tenant, with a tuning pass on the new environment.
Infrastructure-as-code and documentation
The target environment delivered as maintainable infrastructure-as-code with documentation, so the SaaS team or any future vendor can run it.
Post-migration optimization retainer
Ongoing performance, cost, and scaling work available at the $175/hr Development Lab rate.
Migration assessment
Rule27 maps the current stack, the tenant model, the data boundaries, and the compliance gaps, and returns a written assessment of what moves, in what order, and where the zero-downtime risks are.
Target-architecture design
The AWS or Azure target is designed for multi-tenancy: the compute and data model, per-tenant isolation controls, and cost-per-tenant visibility so unit economics stay legible after the move.
Staged, zero-downtime cutover
The cutover runs blue/green with active traffic and per-tenant staging, so paying tenants are moved without downtime and a failed batch can be rolled back rather than cleaned up by hand.
SOC 2 evidence collection
Access controls, logging, encryption, and change-management evidence are captured during the migration, so a SOC 2 or ISO 27001 gap is closed by the move rather than reconstructed afterward.
Post-migration optimization
A FinOps and performance pass tunes the new environment for cost-per-tenant and scale, with ongoing development available at the $175/hr Development Lab rate.
Asked often.
How do you migrate a multi-tenant SaaS product without downtime for paying customers?
With a blue/green cutover run per tenant against active traffic, not a big-bang switch. Rule27 stands up the target AWS or Azure environment alongside the existing one, migrates tenants in staged batches with validation at each step, and keeps a rollback path open so a failed batch is reversed rather than cleaned up by hand. Per-tenant staging means a problem with one tenant's data does not take down the others. The whole point of the SaaS-specific approach is that paying customers never experience the migration, which a generic application or data-center migration plan does not guarantee.
Can the migration produce our SOC 2 evidence?
Yes, and that is often the reason to do it now. A SOC 2 or ISO 27001 gap is a common migration trigger, so Rule27 runs the move to capture the evidence an audit needs as it happens: access controls, logging, encryption at rest and in transit, and change-management records. Collecting that during the migration is far cheaper than reconstructing it afterward on a live environment. The result is a target architecture that is both the new home for the product and the backbone of the compliance posture, which turns an infrastructure cost into a milestone the board and auditors both recognize.
Which do you migrate to, AWS or Azure, and what does it cost?
Both. Rule27 migrates and implements on AWS and Azure and holds 56 or more certifications across 9 platforms, so the recommendation follows your product, your team's expertise, and your customers' requirements rather than a single-vendor allegiance. Development work is billed at the $175 per hour Development Lab rate, and the migration is scoped as an assessment, target-architecture design, staged cutover, and optimization pass rather than a flat number quoted before scope is known. A 15-to-150-person SaaS migrating one product is a different, smaller scope than an enterprise moving hundreds of databases, and the plan is sized to that.