AWS Cloud Migration Services for SaaS Companies
AWS cloud migration for SaaS, scoped as an engineering engagement: a documented target architecture, a staged reversible cutover that preserves uptime, cost modeled before the new bill, and the integration path back to the stack. Delivered from the Rule27 Development Lab (56+ certifications across 9 platforms).
A SaaS company moving a revenue-bearing product to AWS risks dropped sessions, lost data, silent integration failures, and a ballooning bill when the migration is scoped as a purchase instead of an engineering project.
Rule27 runs AWS cloud migration for SaaS from the Development Lab, scoping the work as platform by service by workload rather than a generic lift-and-shift. The engagement begins with a documented diagnosis of the current state, over-provisioning, single points of failure, and cost drivers, then produces a target architecture with compute, data-layer, networking, and security decisions written down with their tradeoffs. Cost is modeled against projected load before provisioning. The cutover is staged and reversible so sessions are never dropped, and the integration path back to the product database, application layer, CRM, and data services is designed in rather than cleaned up afterward. The team that writes the plan is the team that executes it, backed by 56 or more certifications across 9 platforms.
Current-state diagnosis
A documented read of over-provisioning, single points of failure, and undocumented decisions in the existing environment.
Target architecture document
Compute, data-layer, networking, and security decisions written down with tradeoffs, auditable and owned by the SaaS team.
Cost model
Projected cost against projected load, with over-provisioning flagged and the target right-sized before provisioning.
Staged cutover plan
A reversible, sequenced migration with data validated on both sides and a real rollback at each step.
Integration path
The mapped reconnection of product database, application layer, CRM, and data services through the cutover.
Optimization retainer
Admin, advisory, and optimization scoped at $175/hr after the migration lands, with fractional technology leadership available at $250/hr.
Diagnose the current state
A documented read of what is over-provisioned, where the single points of failure sit, and which architectural choices were never written down.
Design the target architecture
Platform by service by workload: compute model, data layer, networking, and security boundaries, each decision written down with its tradeoffs so it is auditable.
Model cost before provisioning
Projected cost against projected load, over-provisioning flagged and right-sized, so the new bill is a decision rather than a surprise.
Sequence a reversible cutover
A staged migration with data validated on both sides and a real rollback at each step, so the product stays up and sessions are not dropped.
Wire the integration path
The product database, application layer, CRM, and data services kept firing through the cutover, so integration debt does not compound after the move.
Asked often.
Is this a reseller relationship or an engineering engagement?
An engineering engagement. Rule27 does not resell cloud capacity; it designs the target architecture, sequences the cutover, and owns the failure modes. The work is delivered from the Development Lab, which holds 56 or more certifications across 9 platforms and ships on a modern engineering stack as its daily work, so the team writing the migration plan is the team that implements it. A reseller sells capacity. An engineering partner leaves behind a documented architecture the SaaS team can audit and own.
How is the cost of the migration determined?
The cloud spend is modeled, not quoted blind. Before anything is provisioned, projected cost is run against projected load, over-provisioning is flagged, and the target is right-sized, so the new bill is a decision made with the client rather than a mystery line on an invoice. The fixed, published service pricing around the build is 175 dollars per hour for advisory, admin, and optimization, and 250 dollars per hour for fractional technology leadership. No cloud figure is quoted that is not grounded in the actual engagement.
How do you migrate a live SaaS product without downtime?
With a staged, reversible cutover. Rather than a big-bang move, the migration is sequenced into checkpoints: data is validated on both sides before traffic shifts, failover and recovery are part of the target architecture, and a real rollback exists at each step. That discipline is slower than a one-shot migration and it is why customers never feel the move. The goal is that a SaaS company's customers learn about a successful migration from a changelog, not from an outage.